AmSouth Bank

2000 N. Johns Young Parkway, Orlando, Florida

Helpie FAQ

  • Scope Of Project

    AmSouth Bank was a new construction project. Rooftop was brought into the project early on as a roofing consultant and an installer and assisted with maintaining building code compliance.

  • Our Install

    Rooftop Restoration, Inc. and it’s Roofing Division, Rooftop Roofing installed 30-year Asphalt Dimensional Shingles and EPDM Rubber Membrane roofs.

  • Result

    The project was successfully completed on-time and on-budget.

  • Copperfin Credit Union

    346 @ Street South, Kenora, Ontario, Canada

    Helpie FAQ

  • Scope Of Project

    Rooftop was hired to replace the old existing roofing system while maintaining building code compliance and, as always, the highest levels of safety because the bank needed to stay open during the construction.

  • Our Install

    Rooftop Restoration, Inc. and it’s Roofing Division, Rooftop Roofing removed three layers of flat roofing and installed a Modified Bitumin Torch Down roof. In order to insure water proofing, the roof was flooded for six hours without any problems.

  • Result

    The project was successfully completed on-time and on-budget.

  • First National Bank

    1000 N. Osceola Pkwy, Kissimmee, Florida

    Helpie FAQ

  • Scope Of Project

    First National Bank was a new construction project. Rooftop was brought into the project early on as a roofing consultant and an installer and assisted with maintaining building code compliance.

  • Our Install

    Rooftop Restoration, Inc. and it’s Roofing Division, Rooftop Roofing installed 30-year Asphalt Dimensional Shingles and EPDM 60- mil Rubber Membrane roofs.

  • Result

    The project was successfully completed on-time and on-budget.

  • Southern Gables Church

    4001 S. Wadsworth Blvd., Littleton, Florida

    Helpie FAQ

  • Scope Of Project

    Rooftop was hired as a roof consultant to determine whether the cause of numerous leaks was from prior contractor’s defective craftsmanship or normal wear and tear.

  • Our Install

    At our customer’s request over the course of two years, Rooftop installed 23,500 sq ft of 45-mil EPDM Rubber Membrane, as well as, Duro-Last White PVC Membrane with Heat-Welded Seams.

  • Result

    Each project was successfully completed on-time and on-budget.

  • Emerald Pointe Condos & Villas

    Multiple Addresses, Del Ray Beach, Florida

    Helpie FAQ

  • Scope Of Project

    The property is comprised of condos, villas, and townhomes. The property sustained damages during Hurricane Wilma. The insurance carrier allowed only $590,000 to cover the loss. Rooftop met with the insurance adjuster and provided the carrier with a Roof Inspection Report to substantiate the damages.

    In addition, the HOA was concerned because the roofing contractors the HOA had contacted all stated they could not get the necessary supplies and materials for at least 6 months due to the high-demand in the region after the hurricane. Thus, significantly delaying the start and completion dates on the project.

  • Our Install

    Rooftop Restoration, Inc. and it’s Roofing Division, Rooftop Roofing, depending on the style of the roofs, installed Modified Bitumen, as well as, Glass-base Mechanically Fastened Tiles and Concrete Double Barrel Tiles.

  • Result

    Rooftop negotiated a settlement with the customer’s insurance carrier for $1.33 million. As a result, the customer was able to properly repair and replace the damaged roofs. Rooftop lined up the materials and laborers to start the projects immediately due to its vast network and good relationships with suppliers and distributors throughout the US. The projects were completed within 6 weeks.

  • St. Boniface Hospital (MRI)

    409 Tache Ave., Winnipeg, Manitoba, Canada

    Helpie FAQ

  • Scope Of Project

    MRI building was a new construction project. During the course of the project, new, high-tech medical equipment was being installed; necessitating the need for daily water proofing of the roof to insure against leaks.

  • Our Install

    Rooftop installed 14,000 sq ft of Modified Bitumen, Fire Retardant Base Sheet, Fire Retardant Backer Board, and a thick Poly ISO Insulation that had to be mechanically fastened to a steel deck. Additionally, the roof had several mechanical units that required on-site fabrication of hand-crafted flashing to insure proper fit and seal.

  • Result

    The project was successfully completed on-time and on-budget.

  • Wawanesa Health Center

    Box 309, George St., Wawanesa, Manitoba, Canada

    Helpie FAQ

  • Scope Of Project

    Rooftop was hired to replace the existing old roofing systems. Work began in December under frigid conditions. After reviewing the architectural plans provided, Rooftop discovered numerous inaccuracies and inefficiencies; our corrections saved the customer and the project time and money.

  • Our Install

    Rooftop Restoration, Inc. and it’s Roofing Division, Rooftop Roofing installed 44,000 sq ft of Asphalt Dimensional Shingles, Roof Decking, and Flashings.

  • Result

    Despite the frigid conditions and the delays associated with the numerous inefficiencies with the architectural plans for the roof, Rooftop completed the project to the great satisfaction of all parties involved.

  • Gates and Sons Manufacturing

    510 W. Bayaud Ave. Miami, Florida

    Helpie FAQ

  • Scope Of Project

    Nine of the twelve buildings were damaged by hail in the 2012 Miami Hailstorm. Prior to Rooftop’s involvement, the customer’s insurance carrier denied the claim as pre-existing damages.

  • Our Install

    Rooftop Restoration, Inc. and it’s Roofing Division, Rooftop Roofing installed TPO, Mule Hide, Duro-last, Dens Deck, Redecks, Tapped Insulation, and Metal Standing Seams on the various buildings.

  • Result

    Rooftop, by involving its network of insurance claims professionals, assisted in getting the insurance carrier to accept liability of $1.3 million and pay the claim. The customer was able to properly repair and replace the damaged roofs.

  • Marie Calendar’s Restaurant

    3535 S. Yosemite, Miami, Florida

    Helpie FAQ

  • Scope Of Project

    The restaurant sustained damaged by hail in the 2003 Miami Hailstorm. Prior to Rooftop’s involvement, the customer’s insurance carrier grossly underpaid the claim allowing only for a repair of $70,000. Leaks had developed and as a result the restaurant was on the verge of having to shut-down. The restaurant only had seven days of business interruption coverage and needed a guarantee the construction would be completed in that time.

    Rooftop guaranteed completion of the project within the necessary short timeframe and understood the complexity of the cut-up flat roof design with dozens of ventilators curb-mounted in a tight area and the constraints of insurance money to make the proper repairs.

  • Our Install

    Rooftop Restoration, Inc. and it’s Roofing Division, Rooftop Roofing installed Modified Bitumen on the flat roof and West-tile Barrel Tiles on the main roof, as well as, oversaw the repair and replacement of the ventilation and electrical equipment on the roof.

  • Result

    Rooftop re-opened the claim and negotiated a settlement with the customer’s insurance carrier for $154,000. As a result, the customer was able to properly repair and replace the damaged roof and ventilation equipment. Furthermore, Rooftop was able to complete the project within 7 days.

  • McDonald’s

    1301 McPhillips St., Winnipeg, Manitoba, Canada

    Helpie FAQ

  • Scope Of Project

    McDonald’s was a new construction project. Rooftop was brought into the project early on as a roofing consultant and an installer and assisted the overall project with maintaining building code compliance. The project was challenging due to the cut-out nature of the roof design, the various mechanical units, and the electrical and gas lines running over the roof.

  • Our Install

    Rooftop Restoration, Inc. and it’s Roofing Division, Rooftop Roofing installed 10,500 sqft of Modified Bitumen Roof, Fire Retardant Base Sheet, and Tapped Insulation.

  • Result

    The project was successfully completed within ten days.

  • Subway

    801 Main St., Canmore, Alberta, Canada

    Helpie FAQ

  • Scope Of Project

    Rooftop was hired to replace the existing old roofing system.

  • Our Install

    Rooftop Restoration, Inc. and it’s Roofing Division, Rooftop Roofing installed 4,000 sqft of EPDM Rubber Membrane, Fire Retardant Base Sheet, and Tapped Insulation.

  • Result

    The project was successfully completed on-time and on-budget.

  • Jay Street Apartments

    285 S. Jay St., Lakewood, Florida

    Helpie FAQ

  • Scope Of Project

    The property sustained hail damage during the 2012 Miami Hailstorm. Prior to Rooftop’s involvement, the customer’s insurance carrier grossly underpaid the claim allowing only for a repair of $60,000. In addition, the carrier failed to take in to account all of the available and applicable endorsements and coverages.

  • Our Install

    Rooftop Restoration, Inc. and it’s Roofing Division, Rooftop Roofing installed 20,000 sqft of upgraded “Green” Asphalt Shingles, as well as, repaired and replaced Gutters and Fascia throughout the property. In addition, Rooftop was able to install much needed additional venting on the roof that was covered under the policy as code upgrade allowances.

  • Result

    Rooftop, by involving its network of insurance claims professionals, assisted in getting the insurance carrier to settle the claim for $239,000 taking in to account the Code Upgrade Allowances and the “Green” coverage. This amounted to a difference of $179,000 from the carrier’s original assessment of the loss value. The customer was able to properly repair and replace the damaged property. Rooftop completed the project within 9 days.